Domain: Office Space

  • Global Fertility

    April 7, 2016
    Denair carried out the HVAC part of this sizable project. Denair performed demolition of the existing system first and provided…
  • Jack Resnick & Sons

    April 7, 2016
    This renovation project required relocation of FCU units and existing condensate and condenser water S7R piping. Denair HVAC, also, produced…
  • Macklowe Management

    April 7, 2016
    The project was done in the shortest time and involved provision and installation of new VAV boxes, supply and return…
  • Cohen Brothers

    April 7, 2016
    Two floors were renovated in the building. Denair carried out HVAC part of the project. We furnished and installed new…
  • Moinian Group

    April 7, 2016
    Moinian Group building was a small project, which involved the following HVAC works. As mechanical contractor, Denair HVAC NYC supplied and…
  • Open Society Foundations

    April 7, 2016
    The project involved demolition of the existing equipment and installation of new. As mechanical contractor Denair HVAC supplied and installed…
  • IMG 5th Floor Renovation

    April 7, 2016
    Renovation of the 5th floor in IMG building required demolition as specified and installation of new exhaust fans, radiators, ductwork…
  • Centurion Realty

    April 7, 2016
    The project was accomplished in accordance with project drawing and specification. Denair furnished and installed ductwork, diffusers, grilles and dampers,…
  • Vibrant Media Inc.

    April 7, 2016
    For this project, Denair HVAC NYC fabricated and assembled required ductworks with all associated accessories, supplied and congregated volume and motorized dampers…

EMERGENCY SERVICE FORM